The teacup's router resolves HEAD to a remote buffered GET through the
implicit-HEAD fallback, and OPTIONS advertises HEAD. But the remote
route handler forwarded req.method, so the teapot got a HEAD envelope,
found no HEAD plan in resolveRoute, and answered 404.
Forward a HEAD that matched a remote GET as GET. dispatch already drops
the body for HEAD, so the client gets the GET's status and headers and
no body, the same as a local route. An explicit remote HEAD route is
matched first and is still forwarded as HEAD.
The fix is teacup-side (D16, accepted 2026-10-22): the teapot and the
wire protocol are unchanged, so a new teacup works against an older
teapot during a rolling deploy.
Tests cover app.fetch and the Node listener (200 + GET headers + empty
body, OPTIONS, explicit HEAD precedence, 404/500 kept with no body, the
teapot handler called once as GET) and Deno and Bun.
The frozen owner-mesh-allow.json capture changes in the next commit.
Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
Both were synchronous and left the boot to the first request, with the fix
documented as something the caller should remember: `await app.boot()` before
`Deno.serve` / `Bun.serve`. That made the correct use of a core helper depend
on reading a README, in a framework whose whole argument is that order should
not be something you have to get right.
The failure it leaves is the bad kind. `app.fetch` boots lazily and the boot
memo keeps the *rejection*, so a missing signing key does not fail the deploy:
the port binds, every request is answered 500 by the runtime, and none of them
reach `onError`. Anything that health-checks by asking whether the process is
listening sees a healthy server.
`listen()` has always awaited `bootApp()` before binding its socket, with a
comment saying it exists so Node and Deno/Bun serve an identical graph. They
did not. Now the three helpers agree, and the two adapters return promises.
`edgeHandler` is deliberately unchanged: on workerd there is no startup outside
a request, so there is no earlier moment to move the failure to.
Both new tests were confirmed to fail with the gate commented out — without it
`serveBun` resolves instead of rejecting, and serveDeno binds a port that 500s.
Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
The CHANGELOG gains an [Unreleased] section — no version heading, no date —
covering the three mesh changes on this branch and why each one follows from
the first: a remote export is a step now, so it holds nothing between requests,
so an absent teapot costs a 503 rather than a boot.
The README says it in the Honest scope section, where the mesh caveats already
live: what can be exported, what happens if you export a provider anyway, and
why a missing token still fails the boot when an unreachable teapot no longer
does.
Two stale bits go with it. The JSDoc over assertNeedsSatisfiable still quoted
the old unconditional message; the Deno and Bun fixtures still said a teapot
exports its scopes. And the degrade plan's D6 planned to reuse a seam this
branch deleted — a dated note says so, and why a degraded step never needed it.
Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
Deno and Bun mesh fixtures still exported a @Provider, which now throws
at boot. Convert each to a @Step (provide() -> run(), move the class
from providers: [] to steps: []) so the fixtures build a graph the
current mesh actually allows.
test/edge/_worker.mjs is a gitignored esbuild bundle rebuilt by
test/edge/run.ts on every test:edge run, so no source change was needed
there once the fixtures matched. All four suites pass: vitest (Node),
deno test, bun test, and the workerd/miniflare edge run, plus
typecheck.
Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
Every mesh test ran on Node and drove listen(); nothing off Node was covered, so
the cross-runtime work was implemented but not demonstrated. vitest excludes
test/{deno,bun,edge}, so `npm test` would not have noticed either way.
Adds, in the real runtimes:
- Deno and Bun, teapot and teacup, served through serveDeno/serveBun. Bun is not a
duplicate of Deno: its socket events land on a server-level handler, so the
control channel reaches app.upgrade by a different path.
- The interop matrix, in separate processes: a Deno teacup consuming a Node teapot
and a Node teacup consuming a Deno teapot. Each asserts the `runtime` field the
*other* process produces, so a peer answering from the wrong side fails the test.
Node serves and connects with the `ws` package; Deno uses its global WebSocket —
same-runtime tests could never have exercised that pairing.
- A hand-rolled v999 peer, refused across the boundary with both versions named.
Verified these tests fail for the right reason: breaking the control-channel
routing in app.upgrade fails the Node-teacup-consumes-Deno-teapot case and only
that case.
test:deno needs --allow-run/--allow-env to spawn the Node peer. The peer lives in
test/interop rather than test/deno because tsconfig excludes test/deno, so tsx
would not apply experimentalDecorators there; vitest ignores it as a non-.test.ts.
Refs .specs/2026-07-15-green-tea-mesh-cross-runtime-plan.md Task 8
Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>