Formal D4 run after the walk-stack fix (#131) and the router-order fix in
the harness, 16 x 21 rounds on jarvis. Every cell passes; the 10-route
late param hit passes with its CI lower bound at +4.9%. Marks the
b128139 evidence as superseded.
Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
Formal D4 run on jarvis with the baseline's harness, image, and cpuset:
oracle (pre-radix linear matcher) against the radix router at b128139,
16 processes x 21 rounds = 336 paired rounds per cell, plus an A/A
run (oracle against a byte-identical copy) at the same settings.
D4 fails at 10 routes: late param hit +52.5%, method miss +31.8% and path
miss +101.9%, with every CI lower bound far above +5%. 100 routes improve
in every cell, and all 500-route targets are met (-82.5% to -92.1%). A
diagnostic run with three router revisions traces the 10-route regression
to a2b71e2 (try/finally stack reset in the walk). The seam counters
added for the no-recompilation test change nothing.
No threshold was relaxed and no src/ change was made. The raw samples
are committed for an owner decision.
Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>