Commit Graph
4 Commits
Author SHA1 Message Date
chrnx 78b5034936 docs(plans): drop 4.5.3 — the decorator warning is already documented, and the reason given for it was wrong
Two corrections to the phase added an hour ago.

The task asked for documentation that exists. README.md:233 "Why legacy
decorators" and concepts/the-graph.md:43 in the docs repository both already
carry the argument, and carry it better: parameter decorators are
deliberately absent from the TC39 Stage 3 proposal, so a handler taking
`@param('id') id: string` is only expressible with legacy decorators, and
Stage 3 means the replacement is not finalized either. Writing a third,
shorter version of that in Honest scope would have made it worse.

The task also justified itself with a claim that is false. It said the
framework depends on emitDecoratorMetadata. It does not:
`grep -rn 'design:type\|design:paramtypes' src/` returns nothing. The flag is
set in tsconfig.json and deno.json, but no design:* reflection is read
anywhere in src/ — argument positions are recorded explicitly. Both documents
already state this, which is how the error surfaced.

What survives is a note rather than a task, because the warning arrives in CI
together with the new gate and would otherwise read as something the gate
found.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
2026-08-17 11:19:41 -05:00
chrnx a5c1fda886 docs(plans): add Phase 4.5 — move the JSR gate off the tag
Task 2.5 adds public API, and exported types are what JSR's slow-types check
polices. Writing that surface with no JSR gate on pull requests means finding
out at release time whether the shape is publishable, so the phase is
numbered as an insertion and says it runs first.

The first reading of this was wrong and the correction is the useful part:
release.yml already runs `deno publish --dry-run`, before either registry
ships, and a dry run passes today with the slow-types check included. The gap
is not a missing gate, it is when it runs — only on a version tag, so a
Deno-typecheck break or a slow type lands on main in silence and surfaces
while cutting a release. That is the moment release.yml's own npm-audit
comment identifies as having the least time to judge a fix; the workflow
makes that argument for advisories and not for JSR.

Measured rather than assumed: the dry run takes 0.68s against 2.0s for the
whole vitest suite, so it goes in the runtimes job's Deno leg, which already
installs Deno, and needs no more thought than that.

npm test stays Node-only. The runtimes job already covers Deno, Bun and edge
on every push, so they are not unguarded — what is missing is one command a
contributor can run before pushing, which is test:all.

Also recorded: every dry run warns that experimentalDecorators is deprecated
and may be removed. Nothing to fix, no workaround worth inventing early, but
it is a dependency on a deprecated compiler option in a runtime we publish
to, and it belongs in Honest scope rather than in a warning nobody reads.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
2026-08-17 10:44:43 -05:00
chrnx f97ac8098b docs(plans): record the #15 decision and split out shutdown extensibility
The plan asked Task 2.3 to decide between two answers; the decision and what
the runtimes actually allow now sit in it, so the next reader is not re-deriving
either. The Deno constraint in particular was found by measurement and is not
in any issue.

Adds Task 2.5 for the plugin/provider teardown idea, kept out of the #15 work
on purpose: it needs a new await-aware surface on PluginApi, because the
existing Bus is a synchronous observer by design and cannot be made to hold up
a shutdown without losing the guarantee that makes it safe.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
2026-08-16 13:18:06 -05:00
chrnx 9c3bc9574b docs(plans): plan the trust release from the four evaluation reports
The reports in .specs/reports/ were written independently and converge on
observability as the gap that matters most. Two things they demand had no
issue filed at all: CI never runs the Deno/Bun/edge suites that package.json
defines, so the multi-runtime claim has no evidence behind it, and explain()
returns each node's needs without ever naming what produced them.

Sequenced so the cheap phases land first and produce the material the
observability design needs. API freeze stays out: README already declares it
under 'next', and freezing a surface that is still missing its observability
contract would freeze the wrong thing.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
2026-08-16 12:38:12 -05:00