Files
core/test/mesh
chrnx 1975a7c03f
CI / dco (pull_request) Successful in 4s
CI / build (pull_request) Successful in 24s
CI / runtimes (deno) (pull_request) Successful in 18s
CI / runtimes (edge) (pull_request) Successful in 13s
CI / runtimes (bun) (pull_request) Successful in 16m11s
feat(mesh): give boot a grace period for a slow teapot, and fail for an absent one
A teapot that is thirty seconds behind and a teapot that does not exist look
identical for the first thirty seconds, and only one of them should stop a
deploy. bootTimeoutMs is that grace: retries with backoff until it passes.

It still fails after that, deliberately. A provider the graph depends on is
not optional, and booting without it would only move the failure to the first
request, where it is a caller's 503 rather than the deploy's error.

The full battery caught what the first cut got wrong: a bad secret was being
retried. That is not a transient failure — it is the teapot's decision, and it
will be the same decision in thirty seconds, so retrying only spends the
deploy's patience to arrive at the identical error. Refusals now fail at once.

Telling them apart without threading close codes through the neutral socket
contract of four runtimes: a peer that accepted the connection and then hung
up before answering rejected us on purpose; one that never accepted it may
simply not be listening yet. That is exactly the distinction needed here.

Retries are logged and emitted as mesh:boot:retry, kept separate from
mesh:disconnect — that one is a link that was up and went away, this one never
came up, and a deploy watching for trouble wants to tell those apart.

437 vitest / 12 Deno / 7 Bun / edge / JSR dry run.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
2026-08-18 11:28:44 -05:00
..