release: promote the mesh work — reconnection, envelope, boot grace and the transport guard #55

Merged
chrnx merged 8 commits from develop into main 2026-08-18 18:41:55 +00:00
Owner

Fast-forward-only. main becomes an exact copy of develop (2c838c8).

Publishes nothing — only a v* tag publishes, and none is being cut here. Fires promote.yml to GitHub.

Mesh stays alpha. Contents: reconnection with a refusing manifest policy, the caller's identity crossing the wire, a boot grace for a slow teapot, and a teapot that refuses to export what JSON cannot carry. Plus the changelog fold — [26.8.0-beta.1] had a date above work that was never tagged — and the new Releasing rule in AGENTS.md.

Fast-forward-only. `main` becomes an exact copy of `develop` (`2c838c8`). Publishes nothing — only a `v*` tag publishes, and none is being cut here. Fires `promote.yml` to GitHub. Mesh stays **alpha**. Contents: reconnection with a refusing manifest policy, the caller's identity crossing the wire, a boot grace for a slow teapot, and a teapot that refuses to export what JSON cannot carry. Plus the changelog fold — `[26.8.0-beta.1]` had a date above work that was never tagged — and the new `Releasing` rule in `AGENTS.md`.
chrnx added 8 commits 2026-08-18 18:41:04 +00:00
fix(mesh): reconnect to a teapot that came back, refusing a manifest that no longer fits
CI / dco (pull_request) Successful in 4s
CI / runtimes (bun) (pull_request) Successful in 15s
CI / build (pull_request) Successful in 24s
CI / runtimes (edge) (pull_request) Successful in 12s
CI / runtimes (deno) (pull_request) Successful in 18s
6ffbad9825
A dropped link stayed dead for the life of the process. Every RPC answered
503 until the teacup restarted, so deploying a teapot forced a restart of
every teacup depending on it and boot order became load-bearing — a worse
operational property than any gap the docs actually listed.

The Link now outlives any single socket, because the graph captured its rpc
closure at boot and a reconnect that produced a new Link would leave the graph
pointing at the dead one. Backoff doubles from 500ms to 30s with full jitter,
so teacups that went down together do not return in lockstep.

A returning teapot whose manifest no longer exports what the graph was
validated against is refused, not adopted: that graph is already serving, and
a token cannot be validated away after the fact. The link keeps retrying,
since a partial deploy may still restore it, and logs once per distinct
manifest rather than once per attempt. Refusal ships as a named policy
(onManifestChange: 'refuse') so hot reconciliation can arrive later as an
addition rather than as a change of what the default means — these are
separate processes on separate deploy cadences.

close() is terminal. closeLinks runs on shutdown, and a link that reconnected
after the application hung up would leave a process that cannot exit.

Also closes the documented gap where an app-scope export outlived its teapot
with a stale value: a successful reconnect re-registers those bindings, so the
next resolve re-runs the RPC. That invalidation is a named function rather
than inline, because it is the seam a future 'reconcile' reuses.

Tested on all three runtimes rather than on Node alone — Node's ws package,
Deno's global WebSocket and Bun's server-level socket handler are three
implementations, and swapping a socket under a live graph is where they stop
agreeing. 7 of the 9 new Node tests were verified to fail against the old
code; the 2 that pass are the ones that should, since the old code never
reconnected at all.

Mesh stays alpha.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
Merge pull request 'fix(mesh): reconnect to a teapot that came back, refusing a manifest that no longer fits' (#47) from feat/mesh-reconnect into develop
CI / dco (push) Has been skipped
CI / runtimes (bun) (push) Successful in 14s
CI / build (push) Successful in 25s
CI / runtimes (deno) (push) Successful in 18s
CI / runtimes (edge) (push) Successful in 12s
1ccbf6cadf
feat(mesh): carry the caller's identity across the wire, and bound what an unauthenticated peer can do
CI / dco (pull_request) Successful in 4s
CI / runtimes (bun) (pull_request) Successful in 18s
CI / build (pull_request) Successful in 24s
CI / runtimes (edge) (pull_request) Successful in 11s
CI / runtimes (deno) (pull_request) Successful in 18s
f2cb411eac
The observability release gave every request an id and lost it at the process
boundary — in the one place a distributed trace is the entire point. The RPC
envelope now carries requestId, traceId and url, and the teapot adopts them
instead of opening its own investigation.

Both fields are optional on the wire, so the protocol version does not move.
That decision needed a rule rather than a judgement call, so the rule is now
written beside the constant: bump when an old peer would misparse or misbehave
silently, not when work happened. Bumping per change would make the number
mean the opposite of what it is for.

Three things found while in here:

- mesh:rpc:error emitted the per-link counter where every other emitter puts a
  name, so the two sides of one failure could not be matched up.
- The teapot had no handshake deadline, so an unauthenticated peer could hold
  a socket by saying nothing, and no frame size cap, so it could make the
  process JSON.parse up to whatever the socket layer allowed — 100 MiB with
  the ws defaults, before authenticating.
- The remote-route envelope was cast from the internal request object, putting
  ip and protocol on the wire as fields the protocol never declared.

The cleartext warning is a warning and not a refusal on purpose: a private
network already doing mutual TLS is legitimate, and green-tea cannot tell it
apart from an exposed one.

4 of the 8 new tests verified to fail against the old code; the rest are the
negative cases, which should pass both before and after. The Deno test drives
the teapot's frame loop with a raw client, because server-side close codes are
where these runtimes have already differed once.

431 vitest / 12 Deno / 7 Bun / edge / JSR dry run.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
feat(mesh): give boot a grace period for a slow teapot, and fail for an absent one
CI / dco (pull_request) Successful in 4s
CI / build (pull_request) Successful in 24s
CI / runtimes (deno) (pull_request) Successful in 18s
CI / runtimes (edge) (pull_request) Successful in 13s
CI / runtimes (bun) (pull_request) Successful in 16m11s
1975a7c03f
A teapot that is thirty seconds behind and a teapot that does not exist look
identical for the first thirty seconds, and only one of them should stop a
deploy. bootTimeoutMs is that grace: retries with backoff until it passes.

It still fails after that, deliberately. A provider the graph depends on is
not optional, and booting without it would only move the failure to the first
request, where it is a caller's 503 rather than the deploy's error.

The full battery caught what the first cut got wrong: a bad secret was being
retried. That is not a transient failure — it is the teapot's decision, and it
will be the same decision in thirty seconds, so retrying only spends the
deploy's patience to arrive at the identical error. Refusals now fail at once.

Telling them apart without threading close codes through the neutral socket
contract of four runtimes: a peer that accepted the connection and then hung
up before answering rejected us on purpose; one that never accepted it may
simply not be listening yet. That is exactly the distinction needed here.

Retries are logged and emitted as mesh:boot:retry, kept separate from
mesh:disconnect — that one is a link that was up and went away, this one never
came up, and a deploy watching for trouble wants to tell those apart.

437 vitest / 12 Deno / 7 Bun / edge / JSR dry run.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
fix(mesh): refuse to export a value the wire cannot carry, instead of delivering an empty object
CI / dco (pull_request) Successful in 4s
CI / runtimes (bun) (pull_request) Successful in 14s
CI / build (pull_request) Successful in 25s
CI / runtimes (deno) (pull_request) Successful in 18s
CI / runtimes (edge) (pull_request) Successful in 14s
46342a0aa2
Exporting a provider whose value was a connection pool produced HTTP 200 and
 on the other side. JSON keeps the shape and discards everything else, so
what arrived was an object that passed every truthiness check and had no
methods — and the failure surfaced as `db.query is not a function` at a call
site arbitrarily far from the export that caused it. Nothing warned, at either
end, at any point.

The teapot now checks before sending, which is the only place the evidence
still exists: past encode() a pool and an empty object are the same bytes.

An allowlist rather than a denylist. Date is refused too — it would arrive as
a string rather than the declared type, which is the same silent difference
wearing a smaller costume. Bounded by a scan budget so a large legitimate
payload is never turned into an error by the cost of checking it.

The constraint this makes visible was never written down anywhere: a mesh
export carries data, never behaviour. Export what the handle produces rather
than the handle. That limit is what makes an 'executable provider' (#50) the
missing shape rather than a nicety.

442 vitest / 12 Deno / 7 Bun / edge / JSR dry run. All 5 new tests verified to
fail against the old code.

Signed-off-by: Diego Resendez <diego.resendez@zero-oneit.com>
Merge pull request 'feat(mesh): carry the caller's identity across the wire, and bound what an unauthenticated peer can do' (#48) from feat/mesh-envelope into develop
CI / dco (push) Has been skipped
CI / build (push) Successful in 25s
CI / runtimes (bun) (push) Successful in 14s
CI / runtimes (edge) (push) Successful in 12s
CI / runtimes (deno) (push) Successful in 18s
ffb5139cae
Merge pull request 'feat(mesh): give boot a grace period for a slow teapot, and fail for an absent one' (#53) from feat/mesh-boot-retry into develop
CI / dco (push) Has been skipped
CI / runtimes (bun) (push) Successful in 22s
CI / build (push) Successful in 25s
CI / runtimes (edge) (push) Successful in 12s
CI / runtimes (deno) (push) Successful in 18s
cd4f47486f
Merge pull request 'fix(mesh): refuse to export a value the wire cannot carry' (#54) from feat/mesh-transport-guard into develop
CI / dco (pull_request) Successful in 4s
CI / runtimes (bun) (pull_request) Successful in 15s
CI / build (pull_request) Successful in 24s
CI / runtimes (deno) (pull_request) Successful in 18s
CI / runtimes (edge) (pull_request) Successful in 13s
Promote → GitHub / push-github (push) Successful in 6s
CI / dco (push) Has been skipped
CI / runtimes (bun) (push) Successful in 14s
CI / build (push) Successful in 24s
CI / runtimes (deno) (push) Successful in 19s
CI / runtimes (edge) (push) Successful in 14s
2c838c8753
chrnx merged commit 2c838c8753 into main 2026-08-18 18:41:55 +00:00
Sign in to join this conversation.